Erith Deep Wharf

Erith, London, UK

John Shelbourne & Co (Costain)

Contracting


The project consisted of the construction of a Ro-Ro jetty in the River Thames at Erith, London.


Floating crane barges were used to drive the tubular steel piles for the jetty and dolphins.

Client:
Erith Deep Wharf Co
Main Contractor:
John Shelbourne &Co (Costain)
Year:
1980
Back